Latest quotation sheet of foundation decoration wo

2022-07-22
  • Detail

Quotation sheet of basic decoration project (decoration Q & a network) project code: Project Name: family interior decoration serial number project name unit price material and process description - wall decoration project 1 Nippon (Shi Shi Li) square meter 151. Clean the original wall foundation and brush the interface agent once; Apply Meichao 821 putty powder for 2-3 times, level and polish it smoothly; Brush the finishing coat twice, and the amount reaches the manufacturer's standard. 2. If the wall paint of this project has more than two colors, add 1 for each set of additional colors

quotation sheet of basic decoration project (decoration Q & a website)

project code: Project Name: home interior decoration

serial number

project name

unit price

material and process description

I

wall decoration project

1

Nippon (Shi Shili)

square meter

15

1. Cleaning brush the original wall foundation with one coat of interface agent; Apply Meichao 821 putty powder for 2-3 times, level and polish it smoothly; Brush the finishing coat twice, and the amount reaches the manufacturer's standard. 2. If the wall paint of this project has more than two colors, an additional 150 yuan will be added for each set of additional colors. 3. No primer. 4. The cost of removing the wall covering of paint, wallpaper, wall cloth, spraying and other non hydrophilic coating layers is calculated separately. 5. If the wall lining is used, an additional 5 yuan/square meter will be added

2

Nippon (Medley)

square meters

18

1. Clean the original wall foundation and brush the interface agent once; Apply Meichao 821 putty powder for 2-3 times, level and polish it smoothly; Brush the finishing coat twice, and the amount reaches the manufacturer's standard. 2. If the wall paint of this project has more than two colors, an additional 150 yuan will be added for each set of additional colors. 3. No primer. 4. The cost of removing the wall covering of paint, wallpaper, wall cloth, spraying and other non hydrophilic coating layers is calculated separately. 5. If the wall lining is used, an additional 5 yuan/square meter will be added

3

Nippon (yongdeli)

square meters

25

1. Clean the original wall foundation and brush the interface agent once; Apply Meichao 821 putty powder for 2-3 times, level and polish it smoothly; Brush the finishing coat twice, and the amount reaches the manufacturer's standard. 2. If the wall paint of this project has more than two colors, an additional 180 yuan will be added for each set of additional colors. 3. Excluding primer, if primer is added, an additional 2 yuan will be added per square meter. 4. The cost of removing the wall covering of paint, wallpaper, wall cloth, spraying and other non hydrophilic coating layers is calculated separately. 5. If the wall lining is used, an additional 5 yuan/square meter will be added

4

Dulux (five in one and two generations)

square meters

24

1. Clean the original wall foundation and brush the interface agent once; Apply Meichao 821 putty powder for 2-3 times, level and polish it smoothly; Brush one coat of primer and two coats of finish paint, and the dosage shall meet the manufacturer's standard. 2. If the wall paint of this project has more than two colors, an additional 200 yuan will be added for each set of additional colors. 3. The cost of removing the wall covering of paint, wallpaper, wall cloth, spraying and other non hydrophilic coating layers is calculated separately. 4. If the wall lining is used, an additional 5 yuan/square meter will be added. (decoration Q & a website)

5

Dulux second generation hardcover (five in one)

square meters

28

1. Clean the original wall foundation and brush the interface agent once; Apply Meichao 821 putty powder for 2-3 times, level and polish it smoothly; Brush one coat of primer and two coats of finish paint, and the dosage shall meet the manufacturer's standard. 2. If the wall paint of this project has more than two colors, an additional 200 yuan will be added for each set of additional colors. 3. The cost of removing the wall covering of paint, wallpaper, wall cloth, spraying and other non hydrophilic coating layers is calculated separately. 4. If the wall lining is used, an additional 5 yuan/square meter will be added

6

Dulux gold (full effect in one)

square meters

32

1. Clean the original wall foundation and brush the interface agent once; Apply Meichao 821 putty powder for 2-3 times, level and polish it smoothly; Brush one coat of primer and two coats of finish paint, and the dosage shall meet the manufacturer's standard. 2. If the wall paint of this project has more than two colors, an additional 200 yuan will be added for each set of additional colors. 3. The cost of removing the wall covering of paint, wallpaper, wall cloth, spraying and other non hydrophilic coating layers is calculated separately. 4. The light wall needs to be fully covered with cloth, plus 10 yuan/square meter

7

German Dufang antibacterial six in one

square meters

32

1. Clean the foundation of the original wall and brush the interface agent once; Apply Meichao 821 putty powder for 2-3 times, level and polish it smoothly; Brush one coat of primer and two coats of finish paint, and the dosage shall meet the manufacturer's standard. 2. If the wall paint of this project has more than two colors, an additional 300 yuan will be added for each set of additional colors. 3. The cost of removing the wall covering of paint, wallpaper, wall cloth, spraying and other non hydrophilic coating layers is calculated separately. 4. If the wall lining is used, an additional 5 yuan/square meter will be added. (decoration Q & a website)

8

wall wallpaper

square meters

20

1. Clean the foundation of the original wall and hang the interface agent at the bottom. 2. Apply Meichao 821 putty powder for 2-3 times, level and polish it smoothly; Paste wallpaper after sealing the back with varnish twice. 3. Wallpaper, wallpaper special glue for a supply

9

special wall eradication

square meters

3

1. Ordinary putty, wallpaper eradication, labor costs

square meters

6

1. Paint and other non hydrophilic coatings, wall lining removal, labor costs

square meters

7

1. Removal of wall plastering and other special circumstances, labor costs

10

anti cracking treatment of light body wall and sand ash wall

square meter

8

1. After the dacron cloth is soaked in water, it is pasted with white emulsion or special silk screen bandage emulsion. 2. Excluding the treatment of the original wall base

11

light body wall and sand ash wall light body wall sandwich cloth crack prevention treatment

square meter

55

1. Wood keel fire prevention treatment, 9mm thick dragon brand gypsum board cover. 2. Nail hole rust prevention and plate seam treatment. 3. Excluding the original wall foundation treatment and surface coating works

12

advanced treatment of wall crack prevention

square meters

16

1. Clean the base of the original wall and brush the interface agent once. 2. The wall is covered with dacron cloth. 3. Use new environmental protection material "wall lining" to paint and scrape twice. 4. It does not contain surface emulsion paint

13

paste (indoor) wall tiles

square meters

30

1. Wall tiles supplied by Party A: specifications are greater than 150*150mm and less than 350*350mm; Auxiliary materials supplied by Party B: zuanpai 32.5 cement, Zhongsha. 2. The original wall surface shall be cleaned, roughened, roughened with plain ash, and pasted with cement mortar. 3. If white cement is used for jointing, if a special color jointing agent with the same color as the brick is used for jointing, an additional 10 yuan/m2 will be added. 4. Special paving technology, the price is calculated separately

14

stick (indoor) small wall tiles

square meters

38

1. Wall tiles provided by Party A: specification is less than 150*150mm; Auxiliary materials supplied by Party B: zuanpai 32.5 cement, Zhongsha. 2. The original wall surface shall be cleaned, roughened, roughened with plain ash, and pasted with cement mortar. 3. If white cement is used for jointing, if a special color jointing agent with the same color as the brick is used for jointing, an additional 10 yuan/m2 will be added. 4. Special paving technology, the price is calculated separately

15

pasted bluestone slabs, mosaics, cultural stones

square meters

35

1. Main materials provided by Party A; Auxiliary materials supplied by Party B: zuanpai 32.5 cement, Zhongsha. 2. The original wall surface shall be cleaned, roughened, roughened with plain ash, and pasted with cement mortar. 3. If white cement is used for jointing, if a special color jointing agent with the same color as the brick is used for jointing, an additional 10 yuan/m2 will be added

16

wet hanging of stone

square meters

80

1. Main materials for molding provided by Party A; Auxiliary materials supplied by Party B: zuanpai 32.5 cement, Zhongsha. 2. The original wall surface shall be cleaned, roughened, and roughened with plain ash. 3. Expansion plug, copper wire fixation, cement mortar joint filling. 4. Dry hanging plus 30 yuan/m2

17

wall upholstery decoration

square meters

150

1. Multilayer boards, wood keel fire treatment as the base, basswood solid wood line edging. 2. 20mm thick sponge, soft wrapped cloth provided by Party A. 3. Less than 1 square meter is calculated as 1 square meter

18

light partition wall in kitchen and toilet

square meter

120

1 Light brick 100*600*200.2 Excluding plastering and leveling Less than 1 square meter is calculated as 1 square meter

19

ordinary light partition wall

square meter

110

1. Waterproof treatment of wood keel or longpai light steel keel as a frame, 9mm thick longpai gypsum board cover, lined with insulation layer of blockboard, nail hole rust prevention and plate seam treatment. 2. Ash approval and emulsion paint painting are calculated separately. 3. Less than 1 square meter is calculated as 1 square meter

20

make internal insulation wall

square meters

60-120

1. Waterproof treatment of wood keel or longpai light steel keel as a frame, lined with 50mm thick insulation layer, 9mm thick longpai gypsum board cover, nail hole rust prevention and board seam treatment. 2. The cost of painting emulsion paint or tiling on the wall is calculated separately (if using wall lining, add another 5 yuan/square meter). 3. If 5mm cement pressure plate cover is used for surface tiling, 20 yuan will be added per square meter

21

insulation at the top

square meters

90-120

1. Waterproof treatment of wood keel or longpai light steel keel as a frame, lined with 50mm thick insulation layer, 9mm thick longpai gypsum board cover, nail hole rust prevention and board seam treatment. 2. The cost of painting emulsion paint on the top surface is calculated separately (if using wall lining, add 5 yuan/square meter)

22

gypsum board door sealing, window opening

square meter

120

1. Pine keel frame, 9mm thick dragon gypsum board cover, nail hole rust prevention and board seam treatment. 2. The facing plastering or tiling is calculated separately

23

rough wall leveling treatment

square meter

20

1. Cement mortar leveling treatment, and the thickness of the leveling layer is less than 20mm. 2. Add steel wire mesh and add 10 yuan per square meter. 3. If the height is more than 3 meters, it will be counted separately

24

build 12 brick walls

square meters

120

1. Build with 32.5 # cement, medium sand and red machine bricks, and plaster on one side. 2. Double sided plastering plus 20 yuan/m2. 3. Less than 1 square meter is calculated as 1 square meter

25

build 24 brick walls

square meters

160

1. Build with 32.5 # cement, medium sand and red machine bricks, and plaster on one side. 2. Double sided plastering plus 20 yuan/m2. 3. Less than 1 square meter is calculated as 1 square meter

26

glass brick wall masonry

(manual and auxiliary materials)

square meters

65

1. White cement bonding, special cross fixation, glass glue sealing. 2. Excluding the surrounding frame and base. 3. Party A shall provide glass bricks

27

demolition of concrete walls and brick walls

square meters

60

1. Labor costs. 2. The thickness of concrete wall is more than 150mm, and the price is discussed separately. 3. The external walls of buildings with a height of more than 3m shall be discussed separately

28

demolition of light partition wall

square meters

40

1. Labor cost. 2. Light interior wall (including door and window), thermal insulation wall, etc

29

remove the original wall tiles

square meters

18

1. Labor cost

precautions:

1. All the new fees charged by the property management office shall be paid by Party A (owner), except that Party B shall be responsible for the fees of workers handling the pass

2. Circuit wiring: open wire 2.5m2 copper core wire 30 yuan per meter; 4.0m2 copper core wire is 40 yuan per meter (including national standard 2.5m2,4.0m2 copper core wire, high-quality iron sleeve, split wire and fixed card)

circuit dark wire 2.5m2 copper core wire is 35 yuan per meter; 4.0m2 copper core wire is 45 yuan per meter (including national standard, national standard, 2.5m2,4.0m2 copper core wire, high-quality iron sleeve, split wire and fixed card)

weak current transformation: 15 yuan per meter for open line and 25 yuan per meter for dark line (including national standard telephone line, network cable, TV line, high-quality iron sleeve, split line and fixed card). According to the calculation of pipe, the hidden line of concrete

wall needs to be increased by 10 yuan/meter

3. Circuit switch Socket. wired. The telephone bottom cover is 10 yuan each (including national standard insulation bottom cover and manual hole digging installation)

4. Labor cost of lamp installation Copper lamp installation is 5 yuan each Mining lamps are 15 yuan each Grill lights are 30 yuan each All lamps shall be purchased by Party A

5. When calculating the latex paint area, the doors and windows shall be calculated as 50% of the actual area

6. If the quantity and size of each item in the quotation are inconsistent with the actual situation, the actual situation shall prevail

7. This budget does not include taxes. If invoices are required, the owner shall pay 4% of the tax

8. For your benefit, handle warranty in time after the completion and acceptance of decoration. If the warranty is not handled or the project tail is not paid on schedule